I'm looking
for help...
Aidpage is free!
   

Free downloads: GrantGate®  Federal Money Retriever®

Flood Control Projects

Published on AidPage by IDILOGIC on Jun 24, 2005

Administered by:

Possible uses and use restrictions...

Corps of Engineers designs and constructs the projects. Each project selected must be engineering feasible, complete within itself, and economically justified. Nonfederal sponsoring agency will share equally in the cost of feasibility studies (cash and in-kind services), shares in the project cost in cash, lands, damages and project costs in excess of the Federal cost limit of $7,000,000; provides a cash contribution for land enhancement benefits and for project costs assigned to project features other than flood control; prevent future encroachment which might interfere with proper functioning of the project for flood control; and, maintain the project after completion. Local cost participation requirements and procedures for determining the local share of project cost are similar to those for flood control projects specifically authorized by Congress under regular authorization procedures.